Axsail
GLOSSARY · SURVEY TERMS

What is the limitation period for a claim against a marine surveyor?

UPDATED 12 NOVEMBER 2026 · 1 SOURCE

How long after a survey a client can sue the surveyor, why the time bar can end a claim, and what it means for keeping survey notes and photos.

DEFINITION
Limitation period

The time after a survey within which a client can bring a claim. In England and Wales it's generally six years for a claim in contract.

ALSO CALLED: TIME BAR, LIMITATION ACT

A limitation period is the time within which a claim must be started. Insurance Business, reporting a case from ITIC's claims review, summarises the Limitation Act 1980 for England and Wales: generally six years from the breach for a claim in contract, and six years from the damage, or from when it became known, for a claim in negligence. An expired period is a complete defence.

What a surveyor checks

How long to keep notes, photos, terms and reports. In the case reported, a claim of over $5 million was first presented nearly six years after the loss and failed on the time bar, after over $200,000 in legal costs. ITIC's claims director noted that the risk of a claim can remain for years.

In the report

Nothing goes in the report itself, but the report is the record that answers a late claim. Date every finding and photo, and keep the file for at least the limitation period where you work.

Frequently asked

How long can a client wait to claim against a surveyor?

In England and Wales, the Limitation Act 1980 generally allows six years from the breach for a claim in contract, and six years from the damage or from knowledge for negligence. Other countries set their own periods.

Related terms

Glossary
SURVEY TERMS

Professional indemnity insurance

Insurance that pays a surveyor's legal costs and any damages if a client claims the survey was negligent. IIMS requires its small craft surveyors to hold it.

SURVEY TERMS

Terms of reference

The written instructions agreed with a client before a survey: who the client is, the purpose, what will and won't be inspected, and who may rely on the report.

SURVEY TERMS

Condition and valuation (C&V)

A boat survey that reports the boat's condition and ends with the surveyor's opinion of its market value, often asked for by insurers and lenders.

SURVEY TERMS

Haul-out

Lifting a boat out of the water, usually in a travel hoist, so the surveyor can inspect and sound the hull below the waterline.

SURVEY TERMS

HIN

The 12-character number moulded or fixed on a boat's transom that identifies its builder, serial number and build and model year, like a car's VIN.

SURVEY TERMS

LOA, beam and draft

A boat's three main dimensions. LOA is its length from end to end, beam its greatest width, and draft how deep it sits below the waterline.

Related guides

SURVEY REPORTS · 3 MIN

Scope and limitations in a marine survey report: what to write and when

How to write the scope of inspection and survey limitations in a marine survey report, why to agree them in writing before the survey, and what happened to a surveyor who only put them in the report.

Your full survey report, minutes after the walk-round

Dictate as you inspect. Axsail builds the findings and the report for your signature

Start free